Verify all items below before starting installation. Contact your AISICAN project coordinator if any part is missing or damaged.
| Component / Hardware | Specification | Qty | Purpose |
|---|---|---|---|
| Display Frame Assembly | Triple-screen module | × 3 | Main display units |
| Mounting Bracket | Horizontal load-bearing rail | × 1 | Connects base to display frames |
| Base / Pedestal | Floor-standing column | × 1 | Structural support for entire assembly |
| Expansion Anchor Bolts | M10 × 100 mm | × 8 | Anchor base to hardened floor |
| Silicone Plugs | Standard | × 8 | Cover anchor bolt holes (weatherproofing) |
| Hex Socket Screws | M8 × 40 mm | × 32 | Bracket-to-base (×8); Frame-to-bracket (×24) |
| Hex Socket Screws | M8 × 50 mm | × 4 | Side-edge splicing between adjacent frames |
| Hex Socket Screws | M8 × 10 mm | × 24 | Internal component fastening |
| Anti-Slip Nuts | M8 | × 4 | Lock side-edge M8×50 screws |
Fig. 1 — Parts overview: display frame assemblies, mounting bracket, base, and all hardware
Site Preparation & Floor Drilling
Mark the installation position on the hardened floor surface. Refer to the base hole layout diagram below to confirm the exact anchor hole positions. Using a 12 mm impact drill bit, drill 8 anchor holes in the floor according to the base plate hole pattern. Ensure all holes are vertical and free of debris before proceeding.
Fig. 2a — Base plate anchor hole layout — use this pattern to mark drilling positions on the floor
Fig. 2b — Use a 12 mm drill bit to create 8 anchor holes per the base plate pattern
Anchor the Base & Connect Main Power Supply
Position the base (pedestal) over the drilled holes. Insert and tighten all 8 × M10×100 expansion anchor bolts to secure the base firmly to the floor. Once the base is fixed, route the external power supply cable up through the base interior. After tightening, cover each bolt head with a silicone plug to maintain the IP66 weatherproof rating.
Fig. 3 — Anchor the base to the floor with M10×100 expansion bolts; route the main power cable into the base
Install the Mounting Bracket onto the Base
Lift the horizontal mounting bracket and align it with the top of the base. Secure the bracket to the base using 8 × M8×40 hex socket screws. Confirm the bracket is level before fully tightening.
Fig. 4 — Mount the horizontal bracket onto the base and secure with 8 × M8×40 hex socket screws
Mount the Display Frames onto the Bracket
4.1 Open the rear access door of each display frame before lifting.
4.2 Lift and position the center frame onto the bracket. Align the mounting holes on the frame with those on the bracket.
4.3 Secure the center frame using M8×40 hex socket screws. Then repeat for the left and right frames. A total of 24 × M8×40 screws are used across all three frames (8 per frame).
4.4 Once all three frames are on the bracket, use 4 × M8×50 hex socket screws with 4 × M8 anti-slip nuts to fasten the side-edge splicing holes between adjacent frames. This locks the three panels into a rigid, seamless assembly.
Fig. 5 — Mount all three display frames; install center frame first, then secure side-edge splicing screws
Internal Power & Network Cable Routing
With all rear access doors open, route the internal power and network cables as follows:
Center screen: Connect the center screen’s power and network cables directly downward through the bottom opening of the center frame into the base.
Left & right screens: Route each side screen’s cables through the side pass-through hole into the interior of the center frame. From there, route all cables downward through the center square knockout at the bottom of the center frame into the base, where they connect to the main power supply and network switch.
Ensure all cables are neatly secured and do not pinch against any metal edges or moving parts.
Fig. 6 — Internal power & network cable routing: side screens feed through pass-through holes into the center frame, then down to the base
Final Inspection & Close-Up
Before closing the rear doors, perform a full inspection:
Verify that all structural screws (M8×40, M8×50, M10×100) are fully tightened. Confirm that all power and network cables are correctly connected, properly routed, and free from pinch points. Check that all 8 silicone plugs are seated on the anchor bolt heads. Once satisfied, close and lock all rear access doors on each display frame.
Fig. 7 — Completed installation: all doors closed, unit ready for power-on verification
Side pass-through →
← Side pass-through
This installation guide is prepared for reference purposes based on the engineering drawings for the AS-WD550D-IP66X3 outdoor triple-screen display (aluminum profile enclosure). All dimensions and specifications stated herein are indicative only. For all on-site engineering and structural decisions, the official stamped engineering drawings supplied with the unit shall take precedence.
Installation must be carried out by qualified technicians familiar with commercial display systems and local building regulations. AISICAN Technology accepts no liability for damage, injury, or product failure resulting from incorrect installation, use of non-specified hardware, or failure to follow these instructions.
For project support, custom installation requirements, or technical inquiries, please contact your AISICAN account manager.